Rapi, Amrin Implementation of The Rought Cut Capacity Planning (RCCP) Methods for The Planning of Bottled Drinking Water Production Capacity: A study case. IOP Conference Series: Materials Science and Engineering.

[img] Text (AMRIN RAPI_IMPLEMENTATION OF THE ROUGHT)
Implementation of The Rought Cut Capacity Planning (RCCP).pdf - Published Version

Download (448kB)
[img] Text (Turnitin_Implementation of The Rought Cut Capacity Planning (RCCP))
Turnitin_Prosiding IOP_Implementation of The Rought Cut Capacity Planning (RCCP).pdf - Published Version

Download (905kB)
[img] Text (Bukti Korespondensi_Implementation of The Rought Cut Capacity Planning (RCCP))
Bukti Korespondensi_Implementation of The Rought Cut Capacity Planning (RCCP).pdf - Published Version

Download (793kB)
[img] Text (Surat penerimaan Abstrak_Implementation of The Rought Cut Capacity Planning (RCCP))
Surat Penerimaan Abstrak Lengkap_Implementation of The Rought Cut Capacity Planning (RCCP).pdf - Published Version

Download (646kB)

Abstract

Syifa Ltd is a manufacturing company that produces bottled drinking water with
several types of products produced from their production floor. The main objective of this
research was to predict the total quantity production of the 220 ml bottled mineral water to meet
the consumer demand as scheduled time. In forecasting the demand for production of the 220 ml
glass bottle packaging, the methods used were the Weighted Moving Average (WMA) method
and the Single Exponential Smoothing (SES) method by comparing the size of forecasting errors
using Mean Absolute Deviation (MAD), Mean Square Error (MSE), and Mean Absolute
Percentage Error (MAPE). To determine the supply of glass bottles used the EOQ (Economy
Order Quantity) method to determine the purchase of the most economical glass bottles. The
Rought Cut Capacity Planning (RCCP) analysis result shows that there was insufficient
capacity/lack of capacity in the filling and packing work center. Alternative capacity
management used to optimize production utility to 95% and make capacity adjustments (readjustment).
So that alternative capacity management was able to meet the capacity shortages
that occur

Item Type: Article
Subjects: PAK Dosen
Rantai Pasok
Divisions: Publikasi Ilmiah > Seminar Internasional
Depositing User: Amrin Rapi
Date Deposited: 30 Apr 2023 22:46
Last Modified: 31 May 2023 04:29
URI: https://repository.poltekapp.ac.id/id/eprint/3491

Actions (login required)

View Item View Item