Tsuraya, Alyaa Eka (2024) PENGENDALIAN PERSEDIAAN SPAREPART AIR CONDITIONER MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING DI PT PANASONIC MANUFACTURING INDONESIA. Diploma thesis, Politeknik APP Jakarta.
Text (Alyaa Eka Tsuraya_210103985_COVER)
Alyaa Eka Tsuraya_210103985_COVER.pdf - Submitted Version Restricted to Registered users only Download (302kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_LEMBAR PENGESAHAN)
Alyaa Eka Tsuraya_210103985_LEMBAR PENGESAHAN.pdf - Submitted Version Restricted to Registered users only Download (795kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_LEMBAR KEASLIAN AKHIR)
Alyaa Eka Tsuraya_210103985_LEMBAR KEASLIAN AKHIR.pdf - Submitted Version Restricted to Registered users only Download (526kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_ABSTRAK)
Alyaa Eka Tsuraya_210103985_ABSTRAK.pdf - Submitted Version Restricted to Registered users only Download (485kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_PRAKATA)
Alyaa Eka Tsuraya_210103985_PRAKATA.pdf - Submitted Version Restricted to Registered users only Download (592kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_DAFTAR ISI)
Alyaa Eka Tsuraya_210103985_DAFTAR ISI.pdf - Submitted Version Restricted to Registered users only Download (757kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_BAB I PENDAHULUAN)
Alyaa Eka Tsuraya_210103985_BAB I PENDAHULUAN.pdf - Submitted Version Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_BAB II STUDI PUSTAKA)
Alyaa Eka Tsuraya_210103985_BAB II STUDI PUSTAKA.pdf - Submitted Version Restricted to Registered users only Download (4MB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_BAB III KERANGKA KERJA PRAKTIK)
Alyaa Eka Tsuraya_210103985_BAB III KERANGKA KERJA PRAKTIK.pdf - Submitted Version Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_BAB IV PEMBAHASAN)
Alyaa Eka Tsuraya_210103985_BAB IV PEMBAHASAN.pdf - Submitted Version Restricted to Repository staff only Download (8MB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_BAB V KESIMPULAN)
Alyaa Eka Tsuraya_210103985_BAB V KESIMPULAN.pdf - Submitted Version Restricted to Registered users only Download (530kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_DAFTAR PUSTAKA)
Alyaa Eka Tsuraya_210103985_DAFTAR PUSTAKA.pdf - Submitted Version Restricted to Registered users only Download (532kB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_LAMPIRAN)
Alyaa Eka Tsuraya_210103985_LAMPIRAN.pdf - Submitted Version Restricted to Registered users only Download (7MB) | Request a copy |
|
Text (Alyaa Eka Tsuraya_210103985_TUGAS AKHIR FULL)
Alyaa Eka Tsuraya_210103985_TUGAS AKHIR FULL.pdf - Submitted Version Restricted to Repository staff only Download (5MB) | Request a copy |
Abstract
Alyaa Eka Tsuraya. NIM: 210103985. Pengendalian Persediaan Sparepart Air Conditioner Menggunakan Metode Material Requirement Planning di PT Panasonic Manufacturing Indonesia. Laporan Tugas Akhir, Jakarta: Politeknik APP Jakarta. Juli 2024.
Laporan Tugas Akhir ini bertujuan untuk melakukan analisis pengendalian sparepart produk air conditioner tipe CU-YN5WKJ. Sparepart yang paling berperan untuk proses pembuatan CU-YN5WKJ yaitu fan motor, compressor, poly e foam, base pan, lead wire complete. Permasalahan yang ditemukan pada gudang sparepart PT Panasonic Manufacturing Indonesia yaitu mengalami overstock atau kelebihan sparepart melebihi jumlah barang yang akan diproduksi terutama pada model AC YN5WKJ. Metode yang digunakan untuk mengatasi masalah tersebut yaitu Material Requirement Planning (MRP). Sebelum melakukan perhitungan MRP, dilakukan forecasting untuk mengetahui jadwal induk produksi untuk tahun 2024, dan metode yang terpilih yaitu holt-winter additive. Perusahaan memiliki ongkos simpan yang tinggi akibat terjadinya kelebihan sparepart. Oleh karena itu, dilakukan perhitungan pengendalian sparepart dengan MRP menggunakan teknik lot sizing Silver Meal dan Least Total Cost (LTC). Hasil perhitungan menyatakan untuk lot sizing Silver Meal tidak terdapat lot sparepart yang disimpan atau ongkos simpan sama dengan nol, untuk metode LTC terdapat lot yang harus disimpan pada level 0 sebanyak 6 periode. Jika dilihat dari ongkos total metode Silver Meal yang memiliki ongkos total terkecil sebesar Rp. 20.603.191. Oleh karena itu, metode Silver Meal yang dipilih karena dapat meminimasi biaya simpan dan memiliki ongkos total terkecil.
Kata Kunci : Forecasting, Material Requirement Planning (MRP), Persediaan
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Forecasting, Material Requirement Planning (MRP), Persediaan |
Subjects: | Manajemen Pengadaan/Pembelian Manajemen Persediaan |
Divisions: | D-3 Manajemen Logistik Industri Elektronika |
Depositing User: | Alyaa Eka Tsuraya |
Date Deposited: | 25 Oct 2024 03:14 |
Last Modified: | 25 Oct 2024 03:14 |
URI: | https://repository.poltekapp.ac.id/id/eprint/4604 |
Actions (login required)
View Item |